Concrete Drilling

Budapest Metro line 4, 1st section (between Kelenföld Station and Keleti Station), Station Fővám square: tunnel construction work related to platform design of the grapple diaphragm, and supporting the front by anchors drilling..

furas1

Rock drilling in large diameter

Budapest Metro line 4, 1st section (between Kelenföld Station and Keleti Station), Station Fővám square: tunnel construction work related to rock freezing; creating the freezing pipes with drilling by means of Tm 105-type self-propelled drill.

furas2

Concrete - reinforced concrete drilling

Budapest Metro line 4, 1st section (between Kelenföld Station and Keleti Station), Station Fővám square: tunnel construction work related to rock freezing; creating the freezing pipes with drilling.

furas3

Rock anchoring

Kozethorgonyzas3

Ground anchoring

Slope reinforcement works with steel mesh, scored concrete, PVC-coated grating, composite geo, geo grid, geo cells; with steel prickles or anchor reinforcement, using Gabion baskets.

 

images16

Strengthening of concrete structures with injection

Betonszerkez meger  injektalassal

Drilling with grout

Fúrás, injektálás