Concrete Drilling
Budapest Metro line 4, 1st section (between Kelenföld Station and Keleti Station), Station Fővám square: tunnel construction work related to platform design of the grapple diaphragm, and supporting the front by anchors drilling..
Rock drilling in large diameter
Budapest Metro line 4, 1st section (between Kelenföld Station and Keleti Station), Station Fővám square: tunnel construction work related to rock freezing; creating the freezing pipes with drilling by means of Tm 105-type self-propelled drill.
Concrete - reinforced concrete drilling
Budapest Metro line 4, 1st section (between Kelenföld Station and Keleti Station), Station Fővám square: tunnel construction work related to rock freezing; creating the freezing pipes with drilling.
Ground anchoring
Slope reinforcement works with steel mesh, scored concrete, PVC-coated grating, composite geo, geo grid, geo cells; with steel prickles or anchor reinforcement, using Gabion baskets.